Track Plan

This page last updated 4/7/2001. Pictures 1, 3, 4, 5, 6, 8, 9 and 11 updated.

This a rough view of the track plan as it stands now. The power plant
and inter modal yard are on a separate shelf connected by lift-up bridges.
The uneven edge at the top is due to the structure of the room.

**The new track plan will be here shortly**

Click on a number to see the corresponding photo on the layout.

Here are some panorama shots of the  left    top    right    of the track plan.

Here is a drawing of the track plan I made using some railroad planning software.
It includes the power plant and inter modal yard shelf layout.   Click here

  Layout Data

  Dimensions - Basic layout 17' x 10'; refinery area 3' x 2'; power plant shelf 22' x 2.5'
  Track - Atlas Code 100 nickel silver
  Minimum mainline radius - 27"
  Turnouts - Atlas #6 on mainline and #4 in yards; Peco Curved
  Turnout operation - Tortoises on mainline, manual ground throws elswhere
  Benchwork - L girder
  Roadbed - cork over plywood
  Maximum grade - 2.5%
  Elevation - 35" at lower staging to 43" at mine
  Era - modern
  Operation - continuous, single main line
  Theme - Power production/distribution